Tekran® 3300 Hg CEM Installed at Cement Plant
The efficacy of the Tekran® 3300 Hg CEM has again been demonstrated with a successful installation at two Pre-Calciner cement plants in the US. The
Home / September 2010
Lifetime Technical &
Application Support
CEM:
1-888-3-TEKRAN
Lab & Air:
1-888-5-TEKRAN
The efficacy of the Tekran® 3300 Hg CEM has again been demonstrated with a successful installation at two Pre-Calciner cement plants in the US. The
The Tekran® ambient air mercury speciation system has been taken to new heights. The Tekran® 2537-1130-1135 speciation system has been successfully deployed for long-term monitoring